Safe Socket Protocol - Site 96
Wiki Article
Site 96, also referred to as the Secure Site Protocol, is a strictly controlled facility maintained by the agency. Its primary function is to safeguard critical Site Ninety Six assets. Site 96 utilizes cutting-edge infrastructure to maintain the highest level of security.
Access to Site 96 is strictly controlled and only granted to authorized personnel. Speculation abound about the true nature conducted within Site 96, but its secretive nature prevents any public disclosure.
Site 96 Anomaly Record
Anomaly Observation at Site 96 has resulted in the Activation of Protocol Epsilon. The primary Objective is to Neutralization of the anomaly and Evaluation of its potential Consequences. Initial Reports indicate a significant Shift in the local Aether continuum. A full Team has been Deployed to the site, and all Troopers are instructed to adhere strictly to Regulation Zeta-7.
- InitialPreliminary findings suggest a possible breach in the dimensional barrier.
- FurtherDetailed investigation is required to confirm the nature and extent of the anomaly.
- All personnel are advised to exercise extreme caution and remain vigilant for any unusual activity.
Site-96 Containment Procedures Revision
This document outlines revisions to the containment procedures for entity contained within Site-96. The primary objective of these revisions is to address recent occurrences and enhance the overall stability of the site. Significant changes include a modified procedure for interaction with the contained entity, as well as {strengthened safeguards to prevent potential breaches. Further details regarding these revisions can be found in the attached report. All personnel assigned to Site-96 are required to review and familiarize themselves with these revised procedures immediately.
- Addendum 96-A outlines specific changes to the containment protocol for entity designation SCP-random number between 1000 and 9999 .
- Personnel assigned to Site-96 are required to undergo mandatory retraining on revised procedures by date.
- Any deviation from the revised containment procedures must be reported to Site-96 command immediately.
Site 96 Personnel Log Entry - Incident Alpha-37
On Cycle Three, a Unexpected event occurred within Site 96. Designated as Incident Alpha-37, the event involved themanifestation of an entity. Initial reports suggest the entity manifested at approximately 03:47 hours, causing widespread disruption to systems. Security protocols were immediately activated, resulting in a minimal containment of the situation. The investigation into Incident Alpha-37 is ongoing, with primary focus placed on identifying the nature and origin of the entity/phenomenon.
- Further details will beprovided as they becomeknown.
Investigation of Site Ninety Six: Preliminary Findings
The recent excavation at Site Ninety Six has yielded some intriguing preliminary results. Archaeologists have unearthed a range of artifacts, including fragments of ceramic, utensils made of bone, and traces of former settlement. These relics suggest that the site was used by a civilization with a sophisticated level of technology and structure. Further analysis of these artifacts is expected to provide insight on the heritage of this significant site.
A list of possible items found at the excavation site:
* Bone needles
* Carved figurines
* Fragments of loom weights
* A hearth area with charred remains
* Coins or other currency
Uncontained Reality Shifts at Site 96
Multiple reports of reality deforming have been documented at Site 96. These events are described by sudden and unpredictable alterations in the spatial surroundings. The extent of these shifts changes widely, ranging from trivial visual anomalies to complete transmutations of the immediate area.
Security protocols at Site 96 have been reinforced in an attempt to contain these phenomena. However, the nature of these reality shifts remain ambiguous, posing a substantial threat to both personnel and containment. A team of scientists has been deployed to Site 96 to investigate the cause of these events and develop strategies for mitigation.
The situation at Site 96 is ongoing under review. The containment breach committee will gather shortly to discuss further measures.
Report this wiki page